1. Ifihan
This manual provides detailed instructions for the assembly, installation, and operation of your TECMOJO 12U Open Frame Network Rack. Please read these instructions carefully before beginning assembly to ensure proper setup and safe use of the product. Retain this manual for future reference.
2. Ọja Ipariview
The TECMOJO 12U Open Frame Network Rack is designed for organizing IT and AV equipment. It features a 4-post design, mobility with casters, and includes server shelves and mounting hardware for 19-inch network, audio, and video devices.
2.1 Key Awọn ẹya ara ẹrọ
- Agbara fifuye: Constructed from durable cold-rolled steel, offering a load-bearing capacity of 260 lbs (floor-mounted).
- Gbigbe: Equipped with four casters for easy movement. Casters include brakes for stability.
- Included Shelves: Comes with two ventilated 1U server shelves.
- Apẹrẹ Anti-Slip: Features anti-slip shelf stops to secure devices on shelves.
- Iṣakoso USB: Integrated grommet holes on the top panel for organized cable routing.
- Iṣagbesori pupọ: Supports both standalone and wall-mounted configurations.
2.2 irinše To wa
Rí i dájú pé gbogbo àwọn ohun èlò tí a kọ sí ìsàlẹ̀ yìí wà níbẹ̀ kí o tó bẹ̀rẹ̀ sí í kó wọn jọ:

Nọmba 1: Awọn ohun elo to wa
- 12U Open Frame Server Rack (main frame components)
- 1U 14-inch Rack Shelf x 2
- Shelf Stop x 4
- Rack Shelf Back Support x 4
- Caster x 4
- L Wrench x 1
- Okun Velcro x 4
- Okun Tii x 4
- 10-32 Screw x 25 (for equipment mounting)
- M5*30 Wall Mounting Screw x 4
- Mounting Hole Drilling Template x 1
3. Awọn pato
| Iwa | Iye |
|---|---|
| Awoṣe | 12U |
| Awọn iwọn Ọja (D x W x H) | 20.2" x 20.5" x 21.0" (512mm x 520mm x 534mm) |
| Iwọn Nkan | 31.7 iwon |
| Ohun elo | Alloy Steel (Cold Rolled Steel) |
| Àwọ̀ | Dudu |
| Load Capacity (Floor-mounted) | 260 lbs |
| Load Capacity (Wall-mounted) | 130 lbs |
| agbeko Iru | 4-Post Open Frame |

olusin 2: Awọn iwọn Ọja
4. Eto ati Apejọ
Assembly typically requires one person and takes approximately 30-60 minutes. A power screwdriver is recommended for efficiency, though an L wrench is provided.
4.1 Apejọ Igbesẹ
- Yọ awọn ohun elo kuro: Carefully remove all parts from the packaging and verify against the 'Components Included' list.
- Apejọ fireemu: Connect the side posts to the top and bottom frame sections using the provided hardware. Ensure all screws are tightened securely.
- Fi Casters sori ẹrọ: Attach the four casters to the bottom frame. Ensure the casters with brakes are positioned for easy access.
- Fi sori ẹrọ Awọn apoti: Position the 1U ventilated shelves at desired heights within the rack. Secure them using the provided 10-32 screws.
- Attach Shelf Stops and Back Supports: Install the anti-slip shelf stops on the shelves to prevent equipment movement. Attach the rack shelf back supports for enhanced stability and load capacity.

Figure 3: Rack with Equipment, showing Anti-Slip Shelf Stops and Back Support
4.2 Iṣagbesori odi (aṣayan)
For wall-mounted installations, use the included mounting hole drilling template and M5*30 wall mounting screws. Ensure the mounting surface can support the rack's weight and equipment (up to 130 lbs).

Figure 4: Wall Mounting Template and Option
5. Awọn ilana Iṣiṣẹ
5.1 Installing Equipment
- Align your 19-inch rack-mountable equipment with the tapped holes on the rack posts.
- Use the provided 10-32 screws to secure equipment. Ensure equipment is evenly distributed to maintain stability.
- For non-rack-mountable equipment, place them on the ventilated shelves and use the anti-slip shelf stops to prevent movement.
5.2 USB Management
Utilize the grommet holes on the top panel for routing cables. Use the included Velcro straps and cable ties to organize and secure cables, preventing strain and improving airflow.

Figure 5: Detailed Features: Grommet Holes, Tapped Holes, and Casters
5.3 Ìrìn àti Ìdúróṣinṣin
- To move the rack, ensure all caster brakes are disengaged.
- When the rack is in its desired position, engage the caster brakes to prevent unintended movement.
6. Itọju
- Ninu: Wipe the rack surfaces with a soft, damp asọ. Yago fun abrasive ose ti o le ba awọn ipari.
- Ayewo: Periodically check all screws and connections to ensure they remain tight. Re-tighten as necessary.
- Pipin fifuye: Ensure equipment weight is evenly distributed to maintain rack stability and prevent stress on components.
7. Laasigbotitusita
- Àìdúróṣinṣin Àgbékalẹ̀: Ensure all frame screws are fully tightened. Verify that caster brakes are engaged when the rack is stationary. Check for uneven weight distribution of equipment.
- Difficulty Mounting Equipment: Ensure equipment is 19-inch rack-mountable. If holes do not align, verify the rack posts are correctly assembled and not warped. Some minor adjustments may be needed during initial setup.
- Awọn ẹya ti o padanu: Refer to the 'Components Included' list. If parts are missing, contact Tecmojo customer support.
8. Atilẹyin ọja ati Support
For warranty information or technical support, please refer to the official Tecmojo webojula tabi kan si wọn onibara iṣẹ Eka. Tọju iwe-ẹri rira rẹ fun awọn ẹtọ atilẹyin ọja.





