Tecmojo 12U

TECMOJO 12U Open Frame Network Rack: Installation and Operation Manual

Awoṣe: 12U

1. Ifihan

This manual provides detailed instructions for the assembly, installation, and operation of your TECMOJO 12U Open Frame Network Rack. Please read these instructions carefully before beginning assembly to ensure proper setup and safe use of the product. Retain this manual for future reference.

2. Ọja Ipariview

The TECMOJO 12U Open Frame Network Rack is designed for organizing IT and AV equipment. It features a 4-post design, mobility with casters, and includes server shelves and mounting hardware for 19-inch network, audio, and video devices.

2.1 Key Awọn ẹya ara ẹrọ

  • Agbara fifuye: Constructed from durable cold-rolled steel, offering a load-bearing capacity of 260 lbs (floor-mounted).
  • Gbigbe: Equipped with four casters for easy movement. Casters include brakes for stability.
  • Included Shelves: Comes with two ventilated 1U server shelves.
  • Apẹrẹ Anti-Slip: Features anti-slip shelf stops to secure devices on shelves.
  • Iṣakoso USB: Integrated grommet holes on the top panel for organized cable routing.
  • Iṣagbesori pupọ: Supports both standalone and wall-mounted configurations.

2.2 irinše To wa

Rí i dájú pé gbogbo àwọn ohun èlò tí a kọ sí ìsàlẹ̀ yìí wà níbẹ̀ kí o tó bẹ̀rẹ̀ sí í kó wọn jọ:

All components included with the TECMOJO 12U Open Frame Network Rack, laid out on a white surface.

Nọmba 1: Awọn ohun elo to wa

  • 12U Open Frame Server Rack (main frame components)
  • 1U 14-inch Rack Shelf x 2
  • Shelf Stop x 4
  • Rack Shelf Back Support x 4
  • Caster x 4
  • L Wrench x 1
  • Okun Velcro x 4
  • Okun Tii x 4
  • 10-32 Screw x 25 (for equipment mounting)
  • M5*30 Wall Mounting Screw x 4
  • Mounting Hole Drilling Template x 1

3. Awọn pato

IwaIye
Awoṣe12U
Awọn iwọn Ọja (D x W x H)20.2" x 20.5" x 21.0" (512mm x 520mm x 534mm)
Iwọn Nkan31.7 iwon
Ohun eloAlloy Steel (Cold Rolled Steel)
Àwọ̀Dudu
Load Capacity (Floor-mounted)260 lbs
Load Capacity (Wall-mounted)130 lbs
agbeko Iru4-Post Open Frame
Diagram showing the dimensions of the 12U network rack: 20.5 inches width, 21.0 inches height, and 20.2 inches depth.

olusin 2: Awọn iwọn Ọja

4. Eto ati Apejọ

Assembly typically requires one person and takes approximately 30-60 minutes. A power screwdriver is recommended for efficiency, though an L wrench is provided.

4.1 Apejọ Igbesẹ

  1. Yọ awọn ohun elo kuro: Carefully remove all parts from the packaging and verify against the 'Components Included' list.
  2. Apejọ fireemu: Connect the side posts to the top and bottom frame sections using the provided hardware. Ensure all screws are tightened securely.
  3. Fi Casters sori ẹrọ: Attach the four casters to the bottom frame. Ensure the casters with brakes are positioned for easy access.
  4. Fi sori ẹrọ Awọn apoti: Position the 1U ventilated shelves at desired heights within the rack. Secure them using the provided 10-32 screws.
  5. Attach Shelf Stops and Back Supports: Install the anti-slip shelf stops on the shelves to prevent equipment movement. Attach the rack shelf back supports for enhanced stability and load capacity.
A TECMOJO 12U network rack with various IT equipment installed, highlighting anti-slip shelf stops and rack shelf back support.

Figure 3: Rack with Equipment, showing Anti-Slip Shelf Stops and Back Support

4.2 Iṣagbesori odi (aṣayan)

For wall-mounted installations, use the included mounting hole drilling template and M5*30 wall mounting screws. Ensure the mounting surface can support the rack's weight and equipment (up to 130 lbs).

Image showing the mounting hole drilling template and a diagram of the rack being wall-mounted, indicating 16-inch mounting holes for stud placement.

Figure 4: Wall Mounting Template and Option

5. Awọn ilana Iṣiṣẹ

5.1 Installing Equipment

  • Align your 19-inch rack-mountable equipment with the tapped holes on the rack posts.
  • Use the provided 10-32 screws to secure equipment. Ensure equipment is evenly distributed to maintain stability.
  • For non-rack-mountable equipment, place them on the ventilated shelves and use the anti-slip shelf stops to prevent movement.

5.2 USB Management

Utilize the grommet holes on the top panel for routing cables. Use the included Velcro straps and cable ties to organize and secure cables, preventing strain and improving airflow.

Close-up images showing grommet holes for cable pass-through, clearly marked and numbered tapped holes for rack mounting, and removable non-skid casters with brakes.

Figure 5: Detailed Features: Grommet Holes, Tapped Holes, and Casters

5.3 Ìrìn àti Ìdúróṣinṣin

  • To move the rack, ensure all caster brakes are disengaged.
  • When the rack is in its desired position, engage the caster brakes to prevent unintended movement.

6. Itọju

  • Ninu: Wipe the rack surfaces with a soft, damp asọ. Yago fun abrasive ose ti o le ba awọn ipari.
  • Ayewo: Periodically check all screws and connections to ensure they remain tight. Re-tighten as necessary.
  • Pipin fifuye: Ensure equipment weight is evenly distributed to maintain rack stability and prevent stress on components.

7. Laasigbotitusita

  • Àìdúróṣinṣin Àgbékalẹ̀: Ensure all frame screws are fully tightened. Verify that caster brakes are engaged when the rack is stationary. Check for uneven weight distribution of equipment.
  • Difficulty Mounting Equipment: Ensure equipment is 19-inch rack-mountable. If holes do not align, verify the rack posts are correctly assembled and not warped. Some minor adjustments may be needed during initial setup.
  • Awọn ẹya ti o padanu: Refer to the 'Components Included' list. If parts are missing, contact Tecmojo customer support.

8. Atilẹyin ọja ati Support

For warranty information or technical support, please refer to the official Tecmojo webojula tabi kan si wọn onibara iṣẹ Eka. Tọju iwe-ẹri rira rẹ fun awọn ẹtọ atilẹyin ọja.

Awọn iwe aṣẹ ti o jọmọ - 12U

Ṣaajuview Tecmojo 0.5U-4-Post Rack Oke selifu ti o wa titi - Ilana itọnisọna
Ilana itọnisọna osise fun Tecmojo 0.5U-4-Post Fixed Rack Mount Shelf (SKU 14130501). Pẹlu awọn ikilọ ailewu, awọn pato, ati itọsọna apejọ ni igbese-nipasẹ-igbesẹ.
Ṣaajuview Tecmojo Irin 2-Post Square Iho Server agbeko Ilana Afowoyi
Ilana itọnisọna fun agbeko olupin onigun mẹrin-meji ti Tecmojo, awọn alaye ni pato, awọn ẹya, ati awọn igbesẹ apejọ fun ọpọlọpọ awọn agbara U.
Ṣaajuview Tecmojo 19in Desktop Open Frame 2 Post Rack Square Iho Ilana itọnisọna
Ilana itọnisọna fun Tecmojo 19in Desktop Open Frame 2 Post Rack Square Hole, ṣe apejuwe awọn ikilo ailewu, awọn pato ọja, ati awọn ilana apejọ-ni-igbesẹ.
Ṣaajuview TecMOJO Wall-Mount Rack Instruction Manual - Installation Guide
Comprehensive instruction manual for TecMOJO Wall-Mount Racks. Includes safety guidelines, specifications, and step-by-step installation instructions for models 11130202, 11130204, 11130207, and 11130211.
Ṣaajuview Tecmojo Open Frame Rack fun Awọn olupin ati AV Gear - Ilana itọnisọna
Ilana itọnisọna pipe fun Tecmojo's Open Frame Racks fun Awọn olupin ati AV Gear. Pẹlu awọn pato, awọn itọnisọna ailewu, ati awọn ilana apejọ fun awọn awoṣe 11120121, 11120122, ati 11120123.
Ṣaajuview Tecmojo 1U-3.94in Selifu Cantilever Adani - Afọwọṣe Fifi sori & Awọn pato
Ilana itọnisọna ati awọn pato fun Tecmojo 1U-3.94in Adani Cantilever Selifu (Awoṣe 14110524). Pẹlu awọn ikilọ fifi sori ẹrọ, awọn alaye ọja, ati alaye ẹya ẹrọ.